About · Est. 2015
Yes, it's literally what we do.
Rack n' Stack, Inc. has been designing, sourcing, deploying, and maintaining physical IT infrastructure since 2015, out of a working warehouse in Las Vegas, with crews that travel to wherever your racks are. We named the company after the least glamorous and most important part of the job, and we have been doing that part properly for a decade.

The short version
From one crew to a nationwide operation
- 1
2015: founded on the physical layer
We started as a deployment crew doing the part of IT everyone else subcontracts: receiving gear, racking it, cabling it, and leaving documentation behind. The habits formed then are still the playbook.
- 2
The warehouse became the hub
Our Las Vegas facility grew from a storage unit's worth of spares into the center of the operation: receiving dock, staging floor, burn-in benches, and the spares shelves that back every maintenance contract.
- 3
Today: crews wherever your racks are
One warehouse in Las Vegas and technicians dispatched across the US. One team that designs, sources, deploys, and maintains, held to one standard.
Where we work from
Warehouse & Office
6442 Windy Rd
Las Vegas, NV 89119
Receiving dock, staging floor, and spares shelves, where your gear gets received, tagged, imaged, and burned in before it ships.
What makes us different
Both halves of the job, one accountable team
We sell the hardware
A VAR with its own warehouse: switches, servers, optics, racks, and power, quoted per line item and staged before shipping.
We do the physical work
Design, rack and stack, structured cabling, and smart hands. Crews turn up with the drawings and leave the documentation behind.
We stay after handoff
Maintenance, spares, and a phone number that reaches a person who has actually racked a switch. Same team, next year too.
The playbook, every time
Design
Site survey, elevations, topology, and a priced bill of materials.
Ship
Hardware sourced and staged through our Las Vegas warehouse.
Rack
Crew on-site: rack, cable, label, and power on to the drawings.
Test
Burn-in, link validation, and firmware baseline before handoff.
Handoff
As-built documentation, photos, and a maintenance path forward.
Want the longer version? Come say hello or call 702-362-7659.
Get started
Put a decade of racking to work
Tell us what you are building and we will tell you exactly how we would deploy it, and what it costs.
or call 702-362-7659 · Mon–Fri 8am–6pm PT